Roads Quotes have been obtained to complete repairs to the Estate roads and renew line marking with thermoplastic paint to all speed humps and junctions. A quote is being obtained to replace the sign at the top end of Park View Road. New manhole covers have been ordered to replace those broken on the Estate. Drains A quote has been approved for gully sucking to clear and unblock all the drains on the Hill and work will commence shortly. New drainage pipes will be installed along Pinner Hill, connecting to the Borough’s mains drain at the bottom of the Hill. These pipes will be installed under driveways without causing damage to existing verge cross-overs. Works will also be undertaken to repair and replace the drain and manhole at the bottom of Hillside Road. Verges/Ditches Gardeners/builders continue to blow leaves and debris into the ditches which causes issues with water drainage. The houses where this regularly occurs will be notified individually and asked to support us in keeping the ditches clear. In addition, the Committee has asked that hedges which belong to residents, should be maintained to ensure they do not encroach the verges. It is not within the Estate gardeners’ remit to cut back hedges belonging to residents. In cases where this is causing a problem, the Committee can arrange for the gardeners to quote to carry out the work, with the cost being met by the resident concerned. Security Research into the installation of ANPR security systems at each of the Estate entrances, continues to be undertaken. Currently, the Committee is talking with power companies to establish the cost of having an energy supply provided to each entrance. Residents will be updated as and when we have an idea of costs and options available. 16.11.22/sf.news.update